Road Granada – San Carlos, Antioquia

The project management is in charge of the consortium formed by Sondeos Estructuras y Geotecnia and JOYCO (SEG-JOYCO), in order to pave 6 kilometers of the corridor that connects the municipalities of Granada and San Carlos. This area of eastern Antioquia, which needed access to the Medellín-Bogotá highway, through which a large part of the

Read More...

Road Salamina – Fundación, Magdalena

The objective of this project is paving 18 kilometers of track and the construction of the Martinica bridge, as well as the maintenance of an additional 60 kilometers of road. Its main use is the transport of cargo, parcels and passengers between the Port of Barranquilla and the center of the country, for this reason

Read More...

Road Management in Casanare

The project development includes routine maintenance activities and the management of road maintenance in the Sogamoso-Aguazul and Monterrey-Yopal sections. INVIAS Territorial Casanare is in charge of the El Crucero-Aguazul sections and the national passage through the municipality of Yopal. This preventive work deals with routine and permanent maintenance along the road. The main objective is

Read More...

Road El Placer – El Paraíso, Valle del Cauca

The Consortium formed by Consultécnicos and JOYCO carries out the construction audit of the rehabilitation of 13.6 kilometers of highway, between El Placer and Hacienda El Paraíso and from El Crucero Santa Elena to Santa Elena. The road is of a secondary nature, with a relatively straight line on flat terrain. It consists of a

Read More...

Road Cisneros-Loboguerrero, Valle del Cauca

The CJ road consortium formed by Consultécnicos and JOYCO audits the construction of a missing section of the dual carriageway in the Cisneros-Loboguerrero section. This is part of the Bogotá-Buenaventura road corridor on route 40, section 4, of the National highway with a total length of 2 kilometers. The purpose of this work is to

Read More...

Audit of the Integrated Public Transportation System SITP, Bogotá

This contract of the Consortium J&S Interventoría de Transporte, including SCAIN and JOYCO, carried out the audit of the mass transport concession contracts in its main highway, zonal and transportation feed components, in the technical, operational, security, environmental, financial and legal areas. In this sense, the operating performance of the concessions was monitored and analyzed

Read More...

Underpass on Calle 94, Bogotá

The underpass on Calle 94 is the most sophisticated road interconnector in Bogotá, made up of roads and subways that has more than 6 kilometers of construction, and around 30,000 square meters of public space. Since the day of its inauguration, public works have improved travel times on Calle 94 with NQS Avenue. This project

Read More...

Marginal de la Selva

JOYCO and Consultécnicos are in charge of the phase 2 of the Marginal de la Selva project. The intervention takes place in the departments of Caquetá, Meta and Guaviare. The construction was carried out prioritizing 11 bridges, 3 of which are large bridges built using successive segments whose lengths are 200, 110 and 140 m

Read More...

Raised Round Point Calle Sexta, Bogotá

This mega-project included the adaptation of 1.6 kilometers of 6th street between the NQS and Caracas avenues as well as the construction of two new stations, one on Carrera 18 and the other on Carrera 27, which are for the exclusive use of Transmilenio’s articulated buses. Beneath the round point are a mixed-use vehicular bridge

Read More...

Highway Pereira – La Victoria

The construction audit was carried out in the operation and maintenance of the concession of the highway Pereira – La Victoria, which had a total length of 54.49 km in double carriageway. We also participated in tolls and toll stations surveillance which were controlled through video, specialized software and system audits. This control was for

Read More...