Marginal de la Selva

JOYCO and Consultécnicos are in charge of the phase 2 of the Marginal de la Selva project. The intervention takes place in the departments of Caquetá, Meta and Guaviare. The construction was carried out prioritizing 11 bridges, 3 of which are large bridges built using successive segments whose lengths are 200, 110 and 140 m

Read More...

Raised Round Point Calle Sexta, Bogotá

This mega-project included the adaptation of 1.6 kilometers of 6th street between the NQS and Caracas avenues as well as the construction of two new stations, one on Carrera 18 and the other on Carrera 27, which are for the exclusive use of Transmilenio’s articulated buses. Beneath the round point are a mixed-use vehicular bridge

Read More...

Highway Pereira – La Victoria

The construction audit was carried out in the operation and maintenance of the concession of the highway Pereira – La Victoria, which had a total length of 54.49 km in double carriageway. We also participated in tolls and toll stations surveillance which were controlled through video, specialized software and system audits. This control was for

Read More...